St Pancras railway station ( or ), also known as London St Pancras and officially since 2007 as St Pancras International, is a central London railway terminus located on Euston Road in the London Borough of Camden. It is the terminal station for Eurostar continental services from London to Paris and Brussels via High Speed 1 and the Channel Tunnel. It also handles East Midlands Trains main line services to Corby, Sheffield and Nottingham, Southeastern high-speed trains to Kent via Ebbsfleet International and Ashford International, and local Thameslink suburban services.
The station was constructed by the Midland Railway in 1868 in order for them to have a dedicated London terminus. Widely known for its Victorian architecture, the station is a Grade I listed building. It stands between the British Library, Regent's Canal and King's Cross railway station, with whom it shares a London Underground station named Kings Cross St. Pancras. After escaping planned demolition in the 1960s, the complex was renovated and expanded from 2001 to 2007 at a cost of £800 million, culminating in a ceremony attended by Queen Elizabeth II and extensive publicity introducing it as a public space. A security-sealed terminal area was constructed for Eurostar services to continental Europe via High Speed 1 and the Channel Tunnel, with platforms for domestic trains to the north and south-east of England. The restored station has 15 platforms, a shopping centre, and a coach facility. St Pancras is owned by London and Continental Railways (LCR) and is managed by Network Rail (High Speed), a subsidiary of Network Rail.
Video St Pancras railway station
Location
St Pancras occupies a site orientated north/south, deeper than it is wide. The south is bounded by Euston Road, with the frontage provided by the St Pancras Renaissance Hotel. Behind the hotel, the Barlow train shed is elevated 5 m (17 ft) above street level, with the area below forming the station undercroft. To the west, the original station is bounded by Midland Road with the British Library on the other side of the road. To the east, it is bounded by Pancras Road and is opposite King's Cross station. The northern half of the station is mainly bounded to the east by Camley Street, with Camley Street Natural Park across the road. To the north-east is King's Cross Central, formerly known as the Railway Lands, a complex of intersecting railway lines crossed by several roads and the Regent's Canal.
Several London bus routes serve St Pancras, including 10, 59, 73, 205 and 390.
Maps St Pancras railway station
History
Requirement for a new station
The station's name comes from the St. Pancras neighborhood in which it is located (which itself ultimately originates from the fourth-century Christian boy martyr Pancras of Rome). The station was commissioned by the Midland Railway. Before the 1860s, the company had a network of routes in the Midlands, and in south and west Yorkshire and Lancashire but no route of its own to the capital. Up to 1857 the company had no line into London, and used the lines of the London and North Western Railway for trains into the capital; after 1857 the company's Leicester and Hitchin Railway gave access to London via the Great Northern Railway.
In 1862, traffic for the second International Exhibition suffered extensive delays over the stretch of line into London over the Great Northern Railway's track; the route into London via the London and North Western was also at capacity, with coal trains causing the network at Rugby and elsewhere to reach effective gridlock. This was the stimulus for the Midland to build its own line to London from Bedford, which would be just under 50 miles (80 km) long.
Design and construction
The station was designed by William Henry Barlow and constructed on a site that had previously been a slum called Agar Town. Though coal and goods were the main motivation to build the station, the Midland realised the prestige of having a central London terminus, and decided it must be based on Euston Road. The company purchased the eastern section of land on the road's north side owned by Earl Somers. The station is now a Grade I listed building
The approaching line to the station crossed the Regent's Canal at height allowing the line reasonable gradients; this resulted in the level of the line at St Pancras being 12 to 17 ft (3.7 to 5.2 m) above the ground level. Initial plans were for a two or three span roof with the void between station and ground level filled with spoil from tunnelling to join the Midland Main Line to the St. Pancras branch (Widened Lines). Instead, due to the value of the land in such a location the lower area was used for freight, in particular beer from Burton (see Brewers of Burton); as a result the undercroft was built with columns and girders, maximising space, set out to the same plans as those used for beer warehouses, and with a basic unit of length that of a beer barrel.
The contract for the construction of the station substructure and connecting lines was given to Messrs. Waring, with Barlow's assistant Campion as supervisor. The lower floor for beer warehousing contained interior columns 15 ft (4.57 m) wide, and 48 ft (14.63 m) deep carrying girders supporting the main station and track. The connection to the Widened Lines (St. Pancras branch) ran below the station's bottom level, in an east-to-west direction.
To avoid the foundations of the roof interfering with the space beneath, and to simplify the design, and minimise cost, it was decided to construct a single span roof, with cross ties for the arch at the station level. The arch was sprung directly from the station level, with no piers. Additional advice on the design of the roof was given to Barlow by Rowland Mason Ordish. The arches' ribs had a web depth of 6 ft (1.8 m), mostly open ironwork. The span width, from wall to wall was 245 ft 6 in (74.83 m), with a rib every 29 ft 4 in (8.94 m) The arch was a slightly pointed design, with a reduced radius of curvature at the springing points. The Butterley Company was contracted to construct the arches. The total cost of the 24 rib roof and glazing was over £53,000, of which over half was for the main ribs. The cost of the gable end was a further £8,500.
The single-span overall roof was the largest such structure in the world at the time of its completion. The materials used were wrought iron framework of lattice design, with glass covering the middle half and timber (inside)/slate (outside) covering the outer quarters. The two end screens were glazed in a vertical rectangular grid pattern with decorative timber cladding around the edge and wrought iron finials around the outer edge. It was 689 feet (210.01 m) long, 240 feet (73.15 m) wide, and 100 feet (30.48 m) high at the apex above the tracks.
The Midland ran a competition for architects to design a hotel to front the station. George Gilbert Scott was persuaded to enter by his friend, Midland director Joseph Lewis, and completed the winning design at home while attending to his son who had fallen ill. Though plans were complete by the end of the year, financial pressure meant construction had to be delayed. Work eventually started in 1868 and the main section of the hotel opened on 5 May 1873, with the west wing following three years later. The building is primarily brick, but polychromatic, in a style derived from the Italian gothic, and with numerous other architectural influences. Gilbert Scott reused many of the design details from his earlier work at Kelham Hall designed in 1857 and completed in 1863, but on a much grander scale for St Pancras.
Early services
St Pancras was built during a period of expansion for the Midland Railway, as the major routes to Manchester, Nottingham, Sheffield and Carlisle opened during this time. By 1902, there were 150 trains arriving and leaving the station daily, though this figure was far less than Waterloo or Liverpool Street. As well as Midland services, the Great Eastern Railway (GER) used St Pancras as a "West End" terminus for trains to Great Yarmouth, Norwich, Lowestoft between 1870 and 1917. At the turn of the 20th century, St Pancras also had a faster service to Cambridge than King's Cross, at 71 minutes. GER services were suspended because of World War I and never resumed.
The London, Tilbury and Southend Railway (LTSR) began offering boat train services from St Pancras from 9 July 1894, following the opening of the Tottenham and Forest Gate Railway. The trains ran from St Pancras to Tilbury via South Tottenham and Barking. Tilbury Docks then provided a connection to Australia and Scandinavia. The following year, the LTSR began a service from St Pancras to Southend Central. Boat trains continued to run from St Pancras until 1963, after which they were moved to Liverpool Street and Fenchurch Street.
Grouping, nationalisation and privatisation
The Railways Act of 1921 forced the merger of the Midland with the London and North Western Railway (LNWR) into the London, Midland and Scottish Railway (LMS), and the LMS adopted the LNWR's (the "Premier Line") Euston station as its principal London terminus. The Midland Grand Hotel was closed in 1935, and the building was subsequently used as offices for British Railways. During the Second World War, bombing inflicted damage on the train shed, which was only partially reglazed after the war. In 1947 the St. Pancras junction was relaid with prefabricated trackwork, along with associated changes to the signalling system.
On the creation of British Railways (BR) in 1948, St Pancras received a significant investment after neglect by the LNWR. Destinations included the London area services to North Woolwich, St Albans and Bedford. Long-distance trains reached Glasgow, Leeds, Nottingham, Sheffield and Manchester, with famous named trains including The Palatine to Manchester, The Thames-Clyde Express to Glasgow, and The Master Cutler to Sheffield (transferred from King's Cross in 1966, which itself had transferred from Marylebone eight years earlier).
On 7 October 1957, the signalling at St Pancras was upgraded, replacing the three original boxes with a power box controlling 205 route switches and 33 points over a network of 1,400 relays. From 1960 to 1966, electrification work on the West Coast Main Line between London and Manchester saw a new Midland Pullman from Manchester to St Pancras. These trains and those to Glasgow were withdrawn following the completion of the rebuilding of Euston and the consolidation of these services.
By the 1960s, St Pancras had come to be seen as redundant, and several attempts were made to close it and demolish the hotel (by then known as St Pancras Chambers). These attempts provoked strong and successful opposition, with the campaign led by the later Poet Laureate, John Betjeman. Jane Hughes Fawcett with the Victorian Society was instrumental in its preservation, and was dubbed "the furious Mrs. Fawcett" by British rail officials. Many of the demonstrators had witnessed the demolition of the nearby Euston Arch a few years' previously, and were strongly opposed to the distinctive architecture of St Pancras suffering the same fate. The plans were scrapped by BR in December 1968, realising that it was more cost-effective to modernise the hotel instead, though they disliked owning it.
In the 1970s, the trainshed roof was in danger of collapse, and the newly appointed Director of Environment Bernard Kaukas persuaded the company to invest £3m to save it.
After the sectorisation of British Rail in 1986, main-line services to the East Midlands were provided by the InterCity sector, with suburban services to St Albans, Luton and Bedford by Network SouthEast. In 1988 the Snow Hill tunnel re-opened resulting in the creation of the Thameslink route and the resultant diversion of the majority of suburban trains to the new route. The station continued to be served by trains running on the Midland main line to Leicester, Nottingham and Sheffield, together with a few suburban services to Bedford and Luton. These constituted only a few trains an hour and left the station underused.
Following the privatisation of British Rail, the long-distance services from St Pancras were franchised to Midland Mainline, a train operating company owned by National Express, starting on 28 April 1996. The few remaining suburban trains still operating into St Pancras were operated by the Thameslink train operating company, owned by Govia, from 2 March 1997.
A handful of trains to and from Leeds were introduced, mainly because the High Speed Train sets were maintained there and were already running empty north of Sheffield. During the 2000s major rebuild of the West Coast Main Line, St Pancras again temporarily hosted direct and regular inter-city trains to Manchester, this time via the Hope Valley route (via the Dore South curve) under the title of Project Rio.
New role
The original plan for the Channel Tunnel Rail Link (CTRL) involved a tunnel from south-east of London to an underground terminus in the vicinity of King's Cross station. However, a late change of plan, principally driven by the then Secretary of State for the Environment Michael Heseltine's desire for urban regeneration in east London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing St Pancras as the terminus, with access via the North London Line, which crosses the throat of the station.
The idea of using the North London line was rejected in 1994 by the transport secretary, John MacGregor, as "difficult to construct and environmentally damaging". However, the idea of using St Pancras station as the terminus was retained, albeit now linked by 12.4 miles (20 km) of new tunnels to Dagenham via Stratford.
London and Continental Railways (LCR), created at the time of British Rail privatisation, was selected by the government in 1996 to reconstruct St Pancras, build the CTRL, and take over the British share of the Eurostar operation. LCR had owned St Pancras station since privatisation to allow the station to be redeveloped. Financial difficulties in 1998, and the collapse of Railtrack in 2001, caused some revision of this plan, but LCR retained ownership of the station.
The design and project management of reconstruction was undertaken on behalf of LCR by Rail Link Engineering (RLE), a consortium of Bechtel, Arup, Systra and Halcrow. The original reference design for the station was by Nick Derbyshire, former head of British Rail's in-house architecture team. The master plan of the complex was by Foster and Partners, and the lead architect of the reconstruction was Alistair Lansley, a former colleague of Nick Derbyshire recruited by RLE.
To accommodate 300-metre+ Eurostar trains, and to provide capacity for the existing trains to the Midlands and the new Kent services on the high-speed rail link, the train shed was extended a considerable distance northwards by a new flat-roofed shed. The station was initially planned to have 13 platforms under this extended train shed. East Midlands services would use the western platforms, Eurostar services the middle platforms, and Kent services the eastern platforms. The Eurostar platforms and one of the Midland platforms would extend back into the Barlow train shed. Access to Eurostar for departing passengers would be via a departure suite on the west of the station, and then to the platforms by a bridge above the tracks within the historic train shed. Arriving Eurostar passengers would leave the station by a new concourse at its north end.
This original design was later modified, with access to the Eurostar platforms from below, using the station undercroft and allowing the deletion of the visually intrusive bridge. By dropping the extension of any of the Midland platforms into the train shed, space was freed up to allow wells to be constructed in the station floor, which provided daylight and access to the undercroft.
The reconstruction of the station was recorded in the BBC Television documentary series The Eight Hundred Million Pound Railway Station broadcast as six 30-minute episodes between 13-28 November 2007.
Rebuilding
By early 2004, the eastern side of the extended train shed was complete, and the Barlow train shed was closed to trains. From 12 April 2004, Midland Mainline trains terminated at an interim station occupying the eastern part of the extension immediately adjacent to the entrance.
As part of the construction of the western side of the new train shed that now began, an underground "box" was constructed to house new platforms for Thameslink, which at this point ran partially under the extended station. In order for this to happen, the existing Thameslink tunnels between Kentish Town and King's Cross Thameslink were closed between 11 September 2004 and 15 May 2005 while the works were carried out. Thameslink services from the north terminated in the same platforms as the Midland Main Line trains, while services from the south terminated at King's Cross Thameslink.
After the blockade of the route was over, the new station box was still only a bare concrete shell and could not take passengers. Thameslink trains reverted to their previous route but ran through the station box without stopping. The budget for the Channel Tunnel Rail Link works did not include work on the fitting out of the station, as these works had originally been part of the separate Thameslink 2000 works programme. Despite lobbying by rail operators who wished to see the station open at the same time as St Pancras International, the Government failed to provide additional funding to allow the fit out works to be completed immediately following the line blockade. Eventually, on 8 February 2006, Alistair Darling, the Secretary of State for Transport, announced £50 million funding for the fit-out of the station, plus another £10-15 million for the installation of associated signalling and other lineside works.
The fit-out works were designed by Chapman Taylor and Arup (Eurostar) and completed by ISG Interior Plc Contractors collaborating with Bechtel as Project Managers. The client was London and Continental Railways who were advised by Hitachi Consulting
In 2005, planning consent was granted for a refurbishment of the former Midland Grand Hotel building, with plans to refurbish and extend it as a hotel and apartment block. The newly refurbished hotel opened to guests on 21 March 2011 with a grand opening ceremony on 5 May, exactly 138 years after its original opening.
By the middle of 2006, the western side of the train shed extension was completed, and on 14 July 2006 Midland Mainline trains moved from their interim home on the east side to the west side of the station.
The rebuilding cost was in the region of £800 million, up from an initial estimate of £310 million.
International station
In early November 2007, Eurostar conducted a testing programme in which some 6000 members of the public were involved in passenger check-in, immigration control and departure trials, during which the "passengers" each made three return journeys out of St Pancras to the entrance to the London tunnel. On 4 September 2007, the first test train ran from Paris Gare du Nord to St Pancras. Children's illustrator Quentin Blake was commissioned to provide a huge mural of an "imaginary welcoming committee" as a disguise for one of the remaining ramshackle Stanley Building South immediately opposite the station exit.
St Pancras was officially re-opened as St Pancras International (which remains the official name for the station) and the High Speed 1 service was launched on 6 November 2007 by the Queen and the Duke of Edinburgh.
During an elaborate opening ceremony, actor Timothy West, as Henry Barlow, addressed the audience, which was also entertained by the Royal Philharmonic Orchestra and the singers Lemar and Katherine Jenkins. In a carefully staged set piece, the first Class 395 train and two Eurostar trains arrived through a cloud of dry ice in adjacent platforms within seconds of each other. During the ceremony, Paul Day's large bronze statue The Meeting Place was also unveiled. At a much smaller ceremony on 12 November 2007, the bronze statue of John Betjeman by sculptor Martin Jennings was unveiled by Betjeman's daughter, the author Candida Lycett Green. Public service by Eurostar train via High Speed 1 started on 14 November 2007. In a small ceremony, station staff cut a ribbon leading to the Eurostar platforms. In the same month, services to the East Midlands were transferred to a new franchisee, East Midlands Trains.
The low-level Thameslink platforms opened on 9 December 2007, replacing King's Cross Thameslink.
Services
The station is the terminus for East Midlands Trains services from London to Derby, Leicester, Nottingham, Sheffield, and smaller towns en route, and for Eurostar's high-speed trains to Paris, Brussels and Lille. Thameslink trains on the cross-London Thameslink route call at platforms beneath the main station, south to Gatwick Airport and Brighton and north to Luton Airport Parkway for Luton Airport and Bedford. High-speed domestic services to Kent, run by Southeastern, depart on the same level as Eurostar & East Midlands Trains.
St Pancras' train shed, completed in 1868 by the engineer William Henry Barlow, was the largest single-span roof built up to that time. The frontage of the station is formed by the former Midland Grand Hotel, designed by George Gilbert Scott, an example of Victorian Gothic architecture, now occupied by the five-star Renaissance London Hotel and apartments.
The terminal is one of relatively few railway stations in England to feature multilingual signage in English and French. Ashford International station has similar bilingual signs. Other stations with foreign-language signs include Southall, which has signs in Punjabi, Wallsend Metro station (Latin), and Moreton-in-Marsh (Japanese). In March 2014, the station's public relations team commissioned a study of mispronounced words, reportedly as a result of passengers referring to the station as "St Pancreas".
Platform layout
St Pancras contains four groups of platforms on two levels, accessed via the main concourse at ground level. The below-surface group contains through platforms A and B, and the upper level has three groups of terminal platforms: domestic platforms 1-4 and 11-13 on each side of international platforms 5-10. Platforms A & B serve Thameslink, 1-4 connect to the Midland Main Line, while platforms 11-13 lead to High Speed 1; there is no connection between the two lines, except for a maintenance siding outside the station.
The longer international platforms, used by Eurostar, extend a considerable distance southwards into Barlow's train shed, whilst the other platforms terminate at the southern end of the 2005 extension. The international platforms do not occupy the full width of the Barlow train shed, and sections of the floor area have been opened up to provide natural light to the new ground-level concourse below. Eurostar's arrival and departure lounges lie below these platforms, adjacent to The Arcade, a concourse fashioned from the original station undercroft which runs along the western length of the Barlow train shed. The southern end of The Arcade links to the western ticket hall of King's Cross St Pancras tube station.
Whilst access to the East Midlands Trains platforms are via the northern end of The Arcade, the Thameslink and domestic High Speed platforms are reached through a street-level concourse which runs east to west at the point where the old and new parts of the station meet. The main pedestrian entrance is at the eastern end of this concourse, where a subway enables pedestrians to reach King's Cross station and the northern ticket hall of the tube station.
Public art
There are several items of art on public display at St Pancras. At the south end of the upper level, a 9-metre (29.5 ft) high 20-tonne (19.7-long-ton; 22.0-short-ton) bronze statue named The Meeting Place stands beneath the station clock. Designed by British artist Paul Day, it is intended to evoke the romance of travel through the depiction of a couple locked in an amorous embrace.
Controversy was caused by Day's 2008 addition of a bronze relief frieze around the plinth. depicting a commuter falling into the path of an Underground train driven by the Grim Reaper. Day revised the frieze before the final version was installed.
On the upper level, above the Arcade concourse, stands a bronze statue of the former Poet Laureate Sir John Betjeman, depicted gazing in apparent wonder at the Barlow roof. Designed by British sculptor Martin Jennings, the statue commemorates the poet's successful campaign to save the station from demolition in the 1960s. The 2-metre (6 ft 7 in)-high statue stands on a flat disc of Cumbrian slate inscribed with lines from Betjeman's poem Cornish Cliffs:
And in the shadowless unclouded glare / Deep blue above us fades to whiteness where / A misty sea-line meets the wash of air.
Underground
A pedestrian subway was built during the station extension. It runs under Pancras Road from the eastern entrance of the domestic concourse to the new northern ticket hall of King's Cross St Pancras tube station (opened November 2009) and the new concourse for King's Cross railway station (opened March 2012).
Hotel
The St. Pancras Renaissance London Hotel occupies parts of the original Midland Grand Hotel, including the main public rooms, together with a new bedroom wing on the western side of the Barlow train shed. The upper levels of the original building have been redeveloped as apartments by the Manhattan Loft Corporation. The hotel held its grand opening on 5 May 2011, exactly 138 years after its original opening in 1873.
Accidents and incidents
On 17 February 1918 a German Gotha aircraft dropped five bombs one of which destroyed the roof of the station's ornate booking hall and killed 20 people. The station was also bombed in World War II, including a land mine damaging the roof on 15-16 October 1940, and a bomb exploding in the beer vaults underneath Platform 3 on 10-11 May 1941.
On 20 July 1959, a locomotive overran a signal and consequently crashed into Dock Junction Signal Box. As a result, trains had to be handsignalled in and out of St Pancras for several days.
Services
Domestic
East Midlands Trains (Midland Main Line)
Since 11 November 2007, platforms 1-4 have been the southern terminus for Midland Main Line trains operated by East Midlands Trains to/from the East Midlands and Yorkshire, including Leicester, Corby, Nottingham, Kettering, Derby and Sheffield. Occasional trains also run to Melton Mowbray, Lincoln, Leeds, York and Scarborough.
As of July 2017, the Monday-Saturday off-peak timetable has five services per hour: three fast and two semi-fast.
Thameslink
On 9 December 2007, as part of the Thameslink Programme, St Pancras International gained platforms on the Thameslink route, replacing King's Cross Thameslink to the south-east. In line with the former station, the Thameslink platforms are designated A and B. The new platforms have met with some criticism for the length of the walking route to the underground as compared with King's Cross Thameslink. The Thameslink Programme involves the introduction of 12-car trains across the enlarged Thameslink network. As extending the platforms at King's Cross Thameslink was thought to be impractical (requiring alterations to Clerkenwell No 3 tunnel and the Circle/Hammersmith & City/Metropolitan Underground lines, which would be extremely disruptive and prohibitively expensive), it was decided to build new Thameslink platforms under St Pancras.
The Thameslink platforms serve trains to Bedford, Luton and St Albans City in the north, and Wimbledon, Sutton, East Croydon, Gatwick Airport and Brighton in the south. The Thameslink Programme will enlarge the Thameslink network more than threefold, from 50 to 172 stations, using a newly-built junction immediately north of the station to connect into the East Coast Main Line just south of Finsbury Park.
Southeastern (High Speed 1 and Kent Coast)
Southeastern runs high-speed Class 395 trains on High Speed 1 to Kent and the South East, to Faversham, Margate, Ramsgate, Canterbury West, Dover Priory, Folkestone Central, Ashford, Ebbsfleet International and other destinations in Kent.
The first domestic service carrying passengers over High Speed 1 ran on 12 December 2008, to mark one year before regular services were due to begin. This special service, carrying various dignitaries, ran from Ashford International to St Pancras. Starting in June 2009, Southeastern provided a preview service between London St Pancras and Ebbsfleet, extending to Ashford International during peak hours. On 7 September 2009 Southeastern extended the peak-time services to Dover and Ramsgate. The full service began on 13 December 2009.
Southeastern High Speed Typical Off-Peak Timetable
Departures
Arrivals
Olympic Javelin service
During the 2012 Summer Olympics in London, St Pancras was the Central London terminus of the Olympic Javelin service, a seven-minute shuttle between Central London and Stratford International station for the London Olympic Park.
International
Eurostar (High Speed 1)
Seventeen pairs of Eurostar trains to and from Paris Gare du Nord every day, ten pairs of trains to and from Bruxelles-Midi/Brussel-Zuid for Brussels and the European Union de facto capital, and one train to and from Marne-la-Vallée for Disneyland Resort Paris. Extra services run to Paris on Fridays and Sundays, with a reduced service to Brussels at weekends. Additional weekend leisure-oriented trains run to the French Alps during the skiing season, and to Marseille via Lyon and Avignon in the summer. It will also serve as the terminus for services to/from Amsterdam from Spring 2018.
Trains observe a mixture of calls at four intermediate stations (Ebbsfleet International, Ashford International, Calais-Fréthun and Lille-Europe), with some running non-stop. Non-stop trains take 2 hours 15 minutes to Paris, and just under 1 hour 50 minutes to Brussels, other trains taking 5 or 10 minutes longer depending on whether they make one or two stops.
Service patterns
Platform usage
Future developments
Competition with Eurostar
In January 2010, the European railway network was opened to liberalisation to allow greater competition. Both Air France-KLM and Deutsche Bahn expressed interest in taking advantage of the new laws to run new services via High Speed 1 to St Pancras.
In December 2009, Deutsche Bahn received permission to run trains through the Channel Tunnel after safety requirements were relaxed. It had previously expressed a desire to run through trains between London and Germany. Direct trains between St Pancras and Cologne could have started before the 2012 Olympics, with plans to run a regular service of three daily trains each direction to Frankfurt, Rotterdam and Amsterdam via Brussels in 2013. Deutsche Bahn trains would be made up of two coupled sets between London and Brussels, dividing at Bruxelles-Midi/Brussel-Zuid. DB showcased an ICE 3 trainset in St Pancras on 19 October 2010. The start date for these services is not expected before 2018. In March 2017 it was announced that Deutsche Bahn had revived plans for a London to Frankfurt train service taking 5 hours, with the service beginning as early as 2020.
In February 2010, the idea of a Transmanche Metro service gained support as local councillors in Kent and Pas-de-Calais announced that they were in talks to establish a high-frequency stopping service between London and Lille. Trains would start at Lille Europe and call at Calais, Ashford International and Stratford International before reaching St Pancras. Since High Speed 1 opened, Ashford and Calais have an infrequent service and Eurostar trains do not call at Stratford International. It was hoped the service would be running by 2012 in time for the London Olympics. The mayor of Calais revived these plans in 2016, and said it could be operational in 5 years (2021).
Great Northern
From December 2018, as part of the Thameslink Programme, services from the East Coast Main Line/Great Northern Route, also part of the Govia Thameslink Railway franchise, will be linked to the Thameslink route, diverting trains previously terminating at Kings Cross into the Thameslink platforms at St Pancras and then through central London to Sussex and Kent. This link was made possible by the construction of two tunnels named the canal tunnels. These are about 100 metres north of the Thameslink platforms, and they will join the ECML where the North London Line and HS1 go over the top.
Freight
On 21 March 2012 a SNCF TGV La Poste trainset was displayed at St Pancras. However, regular services proposed for 2017 would use a new terminal planned near Barking.
King's Cross St Pancras tube station
King's Cross St Pancras tube station serves both King's Cross and St Pancras main-line stations. It is in fare zone 1.
The station has two ticket halls, both of which can be accessed directly from the St Pancras concourse.
References
Notes
Citations
Sources
External links
- Official website
Source of article : Wikipedia